Posted: 16th December 2024
He also inspected an interim storage facility for soil from radiation decontamination work.
In talks with reporters after inspecting the meltdown-hit plant for the first time as prime minister, Ishiba said his government will set up a forum of relevant ministers for talks on the recycling of such soil. The power station was heavily damaged by the March 2011 earthquake and tsunami.
By law, the soil should go through a final disposal process outside of the prefecture by the end of March 2045.