Sizewell - Path Shut for Port

Posted: 18th December 2025

Part of a beach and a coastal path will be shut to allow for a new Sizewell

C marine import facility to be built. Construction will begin in January on
the Suffolk coast and is expected to be completed in March. The new
facility will allow large North Sea barges to berth up close to the site
and offload construction materials for the new nuclear power station. To
allow for this to be built, part of the beach and coastal path will be
closed weekdays. Alison Downes of Stop Sizewell C believed it could “drive
away” people.

BBC 17th Dec 2025

https://www.bbc.co.uk/news/articles/c5y9gx4ljd7o

Find out more – call Caroline on 01722 321865 or email us.